dc.description.abstractDenne rapporten er en casestudie av Sentralbygg 1 og 2 på Campus Gløshaugen ved Norges teknisk-naturvitenskapelige universitet i Trondheim. Byggene er to høyblokker fra 1960-tallet, og er i dag blitt emne for oppgradering. Oppgaven undersøker hvordan en kan oppgradere disse byggene ved innvendig renovering, med TEK17-standard som mål. Arbeidet er gjort ved kartlegging av relevante tegninger og dokumenter, for å få opparbeidet en oversikt over materialer, veggsjikt og opprinnelig standard. Det er også gjort en evaluering av tilstanden til materialene, og dette er gjort med ved en kombinasjon av simuleringer, observasjoner og innhenting av informasjon fra diverse kilder. Kuldebro- og diffusjonsresultater er presentert i oppgaven. Basert på denne informasjonen er konklusjonen at det foreslås å rive de eksisterende indre ytterveggene, for så å installere et moderne sjiktsystem med innovative isolasjonsmaterialer for å minimere ekstra veggtykkelse. Denne løsningen kan redusere energitap og derfor forbedre bygningenes klimapåvirkning. Det er også fastslått at kuldebroene i bygget har stor innvirkning på byggets energiforbruk, noe etterisolering med ny og bedre isolasjon vil redusere. En annen fordel er at flere av materialene som blir demontert har stor resirkuleringsgrad.
dc.description.abstractThis report is a case study of Sentralbygg 1 and 2 located on Gløshaugen Campus at the Norwegian University of Science and Technology in Trondheim. These buildings are two highrise buildings from the 1960s, and have recently become subject to renovation. The objective of this study is to investigate how these buildings can be upgraded through interior renovation while aiming to meet the TEK17 standards. The work is conducted by mapping relevant drawings and documents to obtain an overview of the materials, wall layers, and original standards. An evaluation of the condition of the materials has also been conducted using a combination of simulations, observations, and information obtained from various sources. Based on this information, the conclusion is to recommend demolishing of the existing inner outer walls, and install a modern layering system with innovative insulation materials to minimize extra wall thickness. This solution can reduce energy loss and therefore better the buildings influence on the climate, which was found to be a risk in the simulations. It has also been determined that cold bridges in the building have a significant impact on the building's energy consumption, which can be reduced by reinsulating with new and better insulation materials. Another advantage is that many of the materials being dismantled have a high degree of recyclability.
dc.languagenob
dc.publisherNTNU
dc.titleMuligheter for energieffektiv renovering av yttervegger med bruk av innvendig isolering Case: Campus Gløshaugen ved NTNU Trondheim
dc.typeBachelor thesis