Prediction Model and Simulation Tool for Time and Costs of Drill and Blast Tunnelling
dc.contributor.advisor | Bruland, Amund | |
dc.contributor.author | Zare, Shokrollah | |
dc.date.accessioned | 2023-02-21T07:13:44Z | |
dc.date.available | 2023-02-21T07:13:44Z | |
dc.date.issued | 2007 | |
dc.identifier.isbn | 978-82-471-2839-8 | |
dc.identifier.issn | 1503-8181 | |
dc.identifier.uri | https://hdl.handle.net/11250/3052497 | |
dc.language.iso | eng | en_US |
dc.publisher | NTNU | en_US |
dc.relation.ispartofseries | Doctoral theses at NTNU;2007:129 | |
dc.title | Prediction Model and Simulation Tool for Time and Costs of Drill and Blast Tunnelling | en_US |
dc.type | Doctoral thesis | en_US |
dc.subject.nsi | VDP::Technology: 500::Environmental engineering: 610 | en_US |
dc.description.localcode | Digital fulltext is not available | en_US |