dc.description.abstractDenne rapporten vil ta for seg installasjon- og avinstallasjon av tre fully insulated dummy connectors (FIDC) på gass-kompresjonsanlegget Jansz-Io Subsea Compression project. Den initielle problemstillingen gitt av teknologiselskapet Aker Solutions besto av å løse problemet med å få installert FIDC’ene i et trangt arbeidsområde under et overheng av en ROV på 1300m havdyp. Dette er et nytt problem for Aker Solutions, og har dermed ikke en tidligere løsning på det tidspunktet oppgaven blir skrevet. Den foreslåtte løsningen i denne rapporten er at FIDCene heises ned på vaier og lander på et skinnesystem. En ROV blir brukt til å dytte FIDCene til de er plassert rett over undervanns-koblingene. Deretter heises FIDCene ned i riktig posisjon med en spesiallaget heis som opereres av en ROV. Videre blir FIDCene jekket fast med et av Aker Solutions egne verktøy, og låst fast med en ROV-styrt bolteskåte. Hovedinnovasjonen i denne rapporten er heisen som benytter seg av snekkegir- og tannhjul/tannstang teknologi, som vil gjøre det mulig for en ROV å jekke på plass FIDC-ene i sine respektive undervanns-koblinger. Denne teknologien kan også brukes i fremtidige installasjoner som har liknende utfordringer med installasjoner i subsea miljøet. Idéene til denne prosessen har blitt utviklet gjennom iterative diskusjoner med oppdragsgiveren Aker Solutions, andre eksperter innenfor NTNU/SINTEF og veiledere. I tillegg til detaljerte diskusjoner rundt løsningen, har løsningene blitt visualisert i Solidworks, både som tegninger av komponentene og animasjoner av sammensetningen og prosessen.
dc.description.abstractThis report will explain the concept of installation and deinstallation of three fully insulated dummy connectors (FIDC) on the gas compression facility Jansz-Io. The initial development topic given by the technology corporation Aker Solutions, consisted of the installation of a FIDC in a tight work area. The installation is done by a ROV under an overhang at a depth of 1300m below sea level. This was a new challenge for Aker Solutions and there is no proper solution for this problem at the present time. The suggested solution suggests that the three FIDC mounted on a plate will be hoisted down by cable and will rest on a track system. A ROV will be used to push the FIDC into the right positions above the female wet mates. To connect to the wet mates a custom made lift system, that is operated by the ROV, will lower the FIDC into the wet mates. To get the correct mating force, one of Aker Solutions’ own tools are used. After the correct mating force is applied, a bolt lock mechanism is used to lock the contraption in place with the correct mating force. The key inovation in this report is the lift that lifts and lowers the FIDC into the wet mate connectors. It is based on a worm gear, and rack & pinion technology, which makes it possible to lower the FIDC in place using an ROV. This technology can be used in future installations, with similar challenges. The ideas for the solutions has been developed through iterative discussions with the project owners Aker Solutions, other experts within NTNU/SINTEF and supervisors. In addition to detailed discussions of the solution, the solution has been visualized in Solidworks, both as drawing of the components as well as animation of parts and processes.
dc.languagenob
dc.publisherNTNU
dc.titleUtvikling av installasjonsprosess av "Fully Insulated Dummy Connector" på et subseagasskompresjons-anlegg