Rock Support by Rock Mass Classification Systems for TBM Tunnelling - In Upper Kon Tum, Vietnam
Abstract
The purpose of this thesis is to study the difference in the use of rock support measures intunnels excavated by different methods. The methods examined are excavation by TunnelBoring Machine (TBM) and excavation by drill and blast. The aim of the study has been toaddress whether the smooth contour that excavation by TBM provides, leads to reducedamounts of rock support.Field work has been carried out to examine the possible relation between the method ofexcavation and rock support requirements. The field work was conducted at Upper Kon TumHydroelectric Power Project (HPP) in Vietnam. Here has 650 meters of a headrace tunnel,excavated by TBM, been geologically mapped. At the outlet of the headrace tunnel, a shortportal tunnel was excavated by drill and blast. 105 meters of this portal tunnel was also mappedto be able to compare the need for rock support in the two types of tunnels.The mapped rock mass has been classified according to established rock mass classificationsystems. The Rock Quality Index (Q-system) and the Rock Mass Rating (RMR-system) hasbeen used for this purpose. Estimations of both type and quantity of rock support based on theclassification systems are given, and has been compared to already installed rock support in thetunnels. In addition, estimations regarding costs of rock support has been done.In total 755 meters of the tunnel at Upper Kon Tum HPP were mapped with respect to geology.The rock mass is characterized as hard and competent, and it is regularly intersected by zonesof weakness. The collected data basis consists mainly of rock mass in the classes of fair toextremely good quality, according to the Q-system, and the rock mass classes I and II, accordingto the RMR-system.For rock mass of quality between fair and extremely good, it has been found that only rockbolting is necessary as rock support. The need for rock bolting is reduced by a number of 266rock bolts when the tunnel is excavated by TBM compared to drill and blast. 555 meters of theheadrace tunnel, was within these rock mass classes. The reduced number of bolts correspondsto a saving of around 360 NOK per meter tunnel excavated.The conclusive remarks are that the amount of rock support is reduced in tunnels excavated bytunnel boring machines compared to tunnels excavated by drill and blast in the form of rockbolts. For other kinds of rock support, no relation to the method of excavation has been found.However, the basis of data is not strong enough to make up a final conclusion on this matter. Itis, nevertheless, likely that further studies will be able to confirm this indication.