dc.description.abstractHensikten med rapporten er å kartlegge overvannshåndterings metoder og forslå en rensemetode for overvannet fra E39 og Brusdalsvegen for å sikre vann kvaliteten til Brusdalsvatnet, drikke vannkilden til Ålesund kommune. Samt kartlegge tungmetall forurensing konsentrasjon som er i vannet og jordlaget. Det har blitt tatt jordprøver fra 15 cm dybde og 50 ml vannprøver over fire forskjellige dager. Lab analysene fra prøvene viser en høy konsentrasjon av Kadmium (700 µ/l), Krom (150 µ/l) og Bly (350 µ/l). Det er også funnet midlere verdier av Sink (220µ/l) Kobber (30 µ/l) og Nikkel (90 µ/l). Med den høye tungmetall konsentrasjonen så er det nødvendig med et rensetiltak for overvannet. Utfra retningslinjer, forskrifter og standere, kreves det et en trins renseløsning. Det har blitt sett på forskjellige metoder, der infiltrasjons grøft og vått overvannsbasseng virket som de mest passelige anleggene. Ut fra områdeanalyser gjort falt valget på vått overvannsbasseng. Det er prosjektert for tre våte overvannbassenger, som alle har en teoretisk rensegrad for TSS på 80 %. Første bassenget har et tørrværsvolum på 498,05 m3 og et fordrøyningsvolum på 277m3 som er et totalt volum på 775,05m3. Andre bassenget har tørrværsvolum 1015,50 m3, fordrøyningsvolum 517 m3 og et totalt volum på 1532,5. Tredje bassenget har Tørrværsvolum på 911,40m3, fordrøyningsvolum 469 m3 og et totalt volum på 1380,4 m3. Alle bassengene er utformet med et forsedimenterings basseng. Disse anleggene sikrer vannkvaliteten til brusdalsvatnet. Isdannelsen på bassengene ble regnet ut til å være mellom 5,15 cm og 6,95 cm.
dc.description.abstractThe aim of this study was to determine the concentrations of heavy metals in the catchment of Brusdalvatnet potentially from runnoff that comes from E39 highway and Brusdalsvegen road. Based on the results, a sustainable runnoff treament plan in accordance with the laws and regulations in Norway. We started by collecting soil and water samples from seven different locations in 3 different days and different weather conditions. The Soil samples were taken from land close to the shoreline of the lake while the water samples were taken from streams around the lake. The soil samples were taken at depths of 15 cm, placed in plastic bags, and labelled. At the same time, the water samples were collected in 50 ml centrifuge tubes. In addition, we calculated the traffic volume on the E39 and Brusdalsvegn. This was done in order to identify the possible impact of these roads on the concentrations of the different heavy metals. Laboratory analysis of the samples at NTNU revealed that the samples had high concentrations of cadmium (700 ug/liter), Chromium (150 ug/liter) and Lead(350 ug/liter). In addtion, the follwoing had middle concentrations Zink (220 ug/liter), Copper (30 ug/liter) and Nikkel (90 ug/liter). The high concentrations of these metals can cause a lot of environmental health effects in the lake. Based on guidelines, regulations and the Aalesund water quality requirements, a one-step cleaning solution is required. Various methods for the treatment of the discharge from the catchment were assessed to find a sustainable solution for the lake. Among the methods considered, infiltration trenches and wet ponds were found to be the most suitable methods. After a subsequent survey in the area, it was found that wet ponds can provide effective results. Three wet ponds have been designed, all of which have a theoretical purification rate for TSS of 80%. The first wet pond has a dry weather volume of 498.05 m3 and a delay volume of 277 m3, which gives a total volume of 775.05 m3. The second wet pond has a dry weather volume of 1015.50 m3, delay volume of 517 m3 and a total volume of 1532.5 m3. The third wet pond has a dry weather volume of 911,40 m3, a delay volume of 469 m3 and a total volume of 1380.4 m3. All wet ponds are designed with a pre-settling pool. These plants will ensure the water quality of Brusdalsvatnet and will provide effective results.en
dc.publisherNTNU
dc.titleOvervannshåndtering fra veianlegg
dc.typeBachelor thesis


Tilhørende fil(er)

FilerStørrelseFormatVis

Denne innførselen finnes i følgende samling(er)

Vis enkel innførsel