Vis enkel innførsel

dc.contributor.authorNeupane, Bibek
dc.contributor.authorPanthi, Krishna Kanta
dc.contributor.authorVereide, Kaspar
dc.date.accessioned2020-01-21T12:01:24Z
dc.date.available2020-01-21T12:01:24Z
dc.date.created2019-12-17T11:33:08Z
dc.date.issued2019
dc.identifier.isbn978-82-8208-070-5
dc.identifier.urihttp://hdl.handle.net/11250/2637224
dc.description.abstractThe power market in Norway was deregulated in 1991 and have caused power plants to operate with more frequently varying loads within short time periods. Such operation causes significant pressure fluctuations and unsteady flow along the waterway. Pore water pressure in the rock mass around an unlined tunnel is dependent on the water pressure in the tunnel itself. Hence, pressure transients during load changes cause the rock mass pore pressure to change as well, which may cause instabilities in the tunnel during its long-term operation. However, the relation between power plant operation and rock mass pore pressure variation is largely unknown. A field instrumentation is conducted inside the headrace tunnel of Roskrepp hydropower plant in southern Norway, to measure rock mass pore pressure during power plant operation. The methodology of instrumentation and preliminary results are presented. Results show that pressure transients of both short and long time periods i.e, water hammer and mass oscillations can travel deep into the rock mass. The monitoring is intended to be continued to measure the rock mass pore pressure behaviour over-long term.nb_NO
dc.language.isoengnb_NO
dc.publisherNorsk forening for fjellsprengningsteknikk, Norsk Bergmekanikkgruppe og Norsk Geoteknisk Forening Oslonb_NO
dc.relation.ispartofFJELLSPRENGNINGSTEKNIKK-BERGMEKANIKK-GEOTEKNIKK
dc.titleInstrumentation and pore pressure monitoring technique for unlined tunnels of Norwegian hydropower projects – a case studynb_NO
dc.typeChapternb_NO
dc.description.versionpublishedVersionnb_NO
dc.source.pagenumber23.1-23.10nb_NO
dc.identifier.cristin1761784
dc.relation.projectNorges forskningsråd: 257588nb_NO
dc.description.localcodeThis chapter will not be available due to copyright restrictions (c) 2019 by Norsk forening for fjellsprengningsteknikk, Norsk Bergmekanikkgruppe og Norsk Geoteknisk Forening Oslonb_NO
cristin.unitcode194,64,90,0
cristin.unitcode194,64,91,0
cristin.unitnameInstitutt for geovitenskap og petroleum
cristin.unitnameInstitutt for bygg- og miljøteknikk
cristin.ispublishedtrue
cristin.fulltextoriginal


Tilhørende fil(er)

Thumbnail

Denne innførselen finnes i følgende samling(er)

Vis enkel innførsel