Towards the Understanding of the pH Dependency of the Chloride Binding of Portland Cement Pastes
Journal article, Peer reviewed
Published version
Date
2018Metadata
Show full item recordCollections
Abstract
Hydrated Portland cement paste exposed to a NaCl solution was acidified by adding HCl in small steps, gradually lowering the pH. The chloride binding of the cement paste changed as a function of the pH. For the range of pH from 13.2 to 12.2, decreasing pH resulted in a considerable increase in the chloride binding. At a pH of 11, the cement paste showed almost no chloride binding. In order to explain the changes in chloride binding upon lowering the pH, the phase assemblage was investigated with SEM-EDS, TGA and XRD and compared to a thermodynamic modelling.