PRODUCTION OPTIMIZATION USING RESERVOIR RECOVERY TECHNIQUES
Master thesis
Permanent lenke
http://hdl.handle.net/11250/2569998Utgivelsesdato
2018Metadata
Vis full innførselSamlinger
Sammendrag
From simulation results and economics analysis, waterflooding was found to be an optimum drainage strategy since it is better than other drainage strategies (scenarios) in terms of expected incremental NPV for the Norne E-segment. However, the 4.24 % incremental recovery factor by water flooding seems interesting and will have an expected incremental net present value of +996.542 million USD and the total expected net present value of +2.116 billion USD. It is noted that the additional costs regarding operations and installations were not included in the economics calculation.