Vis enkel innførsel

dc.contributor.advisorDoorman, Gerardnb_NO
dc.contributor.authorBeurling, Steinarnb_NO
dc.date.accessioned2014-12-19T13:52:15Z
dc.date.available2014-12-19T13:52:15Z
dc.date.created2010-10-04nb_NO
dc.date.issued2010nb_NO
dc.identifier354807nb_NO
dc.identifierntnudaim:5538nb_NO
dc.identifier.urihttp://hdl.handle.net/11250/256899
dc.description.abstractCentral Norway has had a significant growth in power consumption over the last few years, and demand is expected to rise. Due to lack of investment in sufficient generation and transmission capacity, Central Norway is expected to have a significant power deficit in an average year and severe deficits in dry years. This thesis investigates the power situation in Central Norway by using the EMPS model developed at SINTEF Energy Research combined with newly developed investment functionality. The thesis has studied the EMPS model and developed new functionality for the investment model in order to do more precise investment analyses. Simulations on optimal investments in different cases concerning increased load and subsidies on wind power investments have been done as well. The simulations show that the power situation Central Norway is close to critical and that investments must be executed to avoid high risk of rationing in a future situation with higher demand. The investment analysis based on the present state show that the proposed transmission investments on Nea--Järpströmmen and Ørskog--Fardal are sensible and very useful for the power situation in Central Norway. Simulations show that subsidies to encourage wind power development might cause more uncertain and variable prices due to lower price incentives to build new transmission capacity. Simulations also show that large wind power investments will have a substantial impact on how hydro power is utilized in Norway. The investment functionality has shown a good capability to obtain sensible solutions that give less price variation throughout the system and reasonable price distributions as long as the investments are small enough to not have substantial impact on hydro power utilization.nb_NO
dc.languageengnb_NO
dc.publisherInstitutt for elkraftteknikknb_NO
dc.subjectntnudaim:5538no_NO
dc.subjectSIE5 energi og miljøno_NO
dc.subjectElektrisk energiteknikkno_NO
dc.titleInvestment Analysis with the EMPS Model with Emphasis on Central Norwaynb_NO
dc.typeMaster thesisnb_NO
dc.source.pagenumber111nb_NO
dc.contributor.departmentNorges teknisk-naturvitenskapelige universitet, Fakultet for informasjonsteknologi, matematikk og elektroteknikk, Institutt for elkraftteknikknb_NO


Tilhørende fil(er)

Thumbnail
Thumbnail

Denne innførselen finnes i følgende samling(er)

Vis enkel innførsel