Vis enkel innførsel

dc.contributor.authorSvalestuen, Fredrik
dc.contributor.authorKnotten, Vegard
dc.contributor.authorLædre, Ola
dc.contributor.authorLohne, Jardar
dc.date.accessioned2018-09-10T13:46:37Z
dc.date.available2018-09-10T13:46:37Z
dc.date.created2018-05-22T13:36:31Z
dc.date.issued2018
dc.identifier.citationLean Construction Journal. 2018, 16-30.nb_NO
dc.identifier.issn1555-1369
dc.identifier.urihttp://hdl.handle.net/11250/2561810
dc.description.abstractQuestion: Q1: What characterizes planning of the building design process in different industries today? Q2: How do the challenges of planning in the building design process stand out from other industries? Q3: How can planning in the building design process be improved? Purpose: The purpose of this paper is to compare the design process in three different industries: 1) Architecture, Engineering, and Construction (AEC), 2) Offshore Construction (OC), and 3) Ship Building (SB), and from that learn how the AECindustry can improve building design management. Research Method: A comparative case study using one case from each industry (AEC, OC and SB) with interviews and a case-specific document study were conducted. In total, thirty-two semi-structured in-depth interviews were used to collect the analysed data from the three cases. Finally, a focus group interview with ten participants was carried out to test and develop a conceptual model. Findings: This paper presents an analysis of the differences between design processes in the three industries and proposes a conceptual model for how building design management can be planned according to the Level of Development (LOD). Limitations: The study is limited to single case studies in companies in three different industries. Implications: The use of the proposed conceptual model with the LOD could improve planning of the building design process. Value for authors: This paper gives project practitioners an insight into how the LOD can be used to structure the planning process and improve the design process. Keywords: Level of Development, Collaborative planning, Design maturity, Building design management.nb_NO
dc.language.isoengnb_NO
dc.publisherLean Construction Institutenb_NO
dc.rightsAttribution-NonCommercial-NoDerivatives 4.0 Internasjonal*
dc.rights.urihttp://creativecommons.org/licenses/by-nc-nd/4.0/deed.no*
dc.titlePlanning the building design process according to Level of Developmentnb_NO
dc.typeJournal articlenb_NO
dc.typePeer reviewednb_NO
dc.description.versionpublishedVersionnb_NO
dc.source.pagenumber16-30nb_NO
dc.source.journalLean Construction Journalnb_NO
dc.identifier.cristin1585954
dc.description.localcodeThe papers on this site are licensed under the Creative Commons Attribution- Noncommercial-No Derivative Works 4.0 Unported License.nb_NO
cristin.unitcode194,64,91,0
cristin.unitcode194,61,50,0
cristin.unitnameInstitutt for bygg- og miljøteknikk
cristin.unitnameInstitutt for arkitektur og planlegging
cristin.ispublishedtrue
cristin.fulltextoriginal
cristin.qualitycode1


Tilhørende fil(er)

Thumbnail

Denne innførselen finnes i følgende samling(er)

Vis enkel innførsel

Attribution-NonCommercial-NoDerivatives 4.0 Internasjonal
Med mindre annet er angitt, så er denne innførselen lisensiert som Attribution-NonCommercial-NoDerivatives 4.0 Internasjonal