dc.contributor.author | Yen, Dung-Bai | |
dc.contributor.author | Crespo del Granado, Pedro Andres | |
dc.contributor.author | Lavrutich, Maria | |
dc.date.accessioned | 2024-08-19T13:43:39Z | |
dc.date.available | 2024-08-19T13:43:39Z | |
dc.date.created | 2024-04-11T10:22:43Z | |
dc.date.issued | 2024 | |
dc.identifier.citation | Energy Strategy Reviews. 2024, 53, 1-16. | en_US |
dc.identifier.issn | 2211-467X | |
dc.identifier.uri | https://hdl.handle.net/11250/3147001 | |
dc.description.abstract | This paper analyses the Norwegian Power System through a sequence of models that represents dynamics of the wholesale power market, distribution power network, end-users, and a coordination scheme between Transmission System Operators (TSOs) and Distribution System Operators (DSOs). The models assess the impact of end-user flexibility and TSO-DSO coordination on the power system’s operation, with an emphasis on two research questions: the extent to which flexibility from end-users affects the power system’s operation under the TSO-DSO coordination scheme, and the potential of the TSO-DSO coordination scheme in incentivizing end-users’ flexibility. The paper presents three scenarios, involving varying degrees of coordination and end-user participation that are modeled and applied to the entire Norwegian power system. The results indicate that active end-user participation in the power market with a TSO-DSO coordination scheme could enhance the flexibility of the power system and support redispatch, while attaining a 14.5% redispatch cost reduction and 0.33% total system cost reduction. These findings offer insights for power system stakeholders concerning the potential advantages and challenges associated with fostering end-user flexibility and further developing TSO-DSO coordination schemes. | en_US |
dc.language.iso | eng | en_US |
dc.publisher | Elsevier | en_US |
dc.rights | Navngivelse 4.0 Internasjonal | * |
dc.rights.uri | http://creativecommons.org/licenses/by/4.0/deed.no | * |
dc.title | Effects of end-user participation under a TSO-DSO coordination scheme for Norway | en_US |
dc.title.alternative | Effects of end-user participation under a TSO-DSO coordination scheme for Norway | en_US |
dc.type | Journal article | en_US |
dc.type | Peer reviewed | en_US |
dc.description.version | publishedVersion | en_US |
dc.source.pagenumber | 1-16 | en_US |
dc.source.volume | 53 | en_US |
dc.source.journal | Energy Strategy Reviews | en_US |
dc.identifier.doi | 10.1016/j.esr.2024.101359 | |
dc.identifier.cristin | 2260906 | |
cristin.ispublished | true | |
cristin.fulltext | original | |
cristin.qualitycode | 1 | |