• norsk
    • English
  • English 
    • norsk
    • English
  • Login
View Item 
  •   Home
  • Fakultet for informasjonsteknologi og elektroteknikk (IE)
  • Institutt for elkraftteknikk
  • View Item
  •   Home
  • Fakultet for informasjonsteknologi og elektroteknikk (IE)
  • Institutt for elkraftteknikk
  • View Item
JavaScript is disabled for your browser. Some features of this site may not work without it.

Spenningsoppgradering av høyspentnettet på Sekken

Risnes, Tonje
Bachelor thesis
Thumbnail
View/Open
no.ntnu:inspera:187445559:231036904.pdf (8.576Mb)
URI
https://hdl.handle.net/11250/3137028
Date
2024
Metadata
Show full item record
Collections
  • Institutt for elkraftteknikk [2669]
Abstract
Samfunnets fokus på bærekraft og miljø driver Norge stadig mot et mer helelektrisk samfunn. Dette fører til effektøkninger i nettet som kan gå utover leveringskvaliteten. Nullutslipps ferger har blitt utbygd flere steder i Norge og det er derfor naturlig å ta hensyn til en eventuell nullutslipps ferge til øya i denne oppgaven. Oppgaven vil foreta beregninger og analyser av hvordan en lastøkning påvirker nettet og om det må foretas en spenningsoppgradering ved effektøkning.

I denne bacheloroppgaven analyseres fire ulike driftsscenarioer for øya Sekken like utenfor Molde. Hensikten med oppgaven er å evaluere og sammenligne disse scenarioene med hensyn til teknisk ytelse og økonomiske kostnader. Scenarioene som vurderes er:

* Drift på 11 kV

* Drift på 11 kV med reserveforsyning

* Drift på 22 kV

* Drift på 22 kV med reserveforsyning

For å gjennomføre analysen, er det benyttet beregningsverktøyet Netbas for å simulere nettets tekniske ytelse i de forskjellige scenarioene. Økonomiske beregninger er utført for å vurdere kostnadene knyttet til vedlikehold, ombygginger og drift av hvert scenario.

Det konkluderes i slutten av oppgaven at det ikke vil være nødvendig med en spenningsoppgradering ved dagens last eller ved lastøkning under 0,5 MW. Det vil derimot være nødvendig med en spenningsoppgradering dersom en lastøkning på over 0,5 MW forekommer. Det vil være naturlig å etablere reserveforsyning ved spenningsoppgradering ettersom kostnaden for dette er svært lav.
 
Society’s focus on sustainability and the environment is driving Norway toward an increasingly all-electric society. This leads to power increases in the grid that can impact delivery quality. Zero-emission ferries have been developed in several places in Norway, so it is natural to consider a potential zero-emission ferry to the island in this assignment. The task will involve calculations and analyses of how a load increase affects the network and whether a voltage upgrade is necessary due to increased power.

In this bachelor thesis, four different operating scenarios for the island of Sekken, located just outside Molde, are analyzed. The purpose of the assignment is to evaluate and compare these scenarios in terms of technical performance and economic costs. The scenarios being considered are:

* Operation at 11 kV

* Operation at 11 kV with backup supply

* Operation at 22 kV

* Operation at 22 kV with backup supply

To conduct the analysis, the Netbas calculation tool has been used to simulate the network’s technical performance under the various scenarios. Economic calculations have been performed to assess the costs associated with maintenance, modifications, and operation of each scenario.

The conclusion at the end of the assignment is that a voltage upgrade will not be necessary for load today or for load increases below 0,5 MW. However, a voltage upgrade will be necessary if a load increase of over 0,5 MW occurs. Establishing a backup supply during a voltage upgrade is natural, as the cost for this is very low.
 
Publisher
NTNU

Contact Us | Send Feedback

Privacy policy
DSpace software copyright © 2002-2019  DuraSpace

Service from  Unit
 

 

Browse

ArchiveCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsDocument TypesJournalsThis CollectionBy Issue DateAuthorsTitlesSubjectsDocument TypesJournals

My Account

Login

Statistics

View Usage Statistics

Contact Us | Send Feedback

Privacy policy
DSpace software copyright © 2002-2019  DuraSpace

Service from  Unit