dc.description.abstractThe build strategy of a ship specifies what is to be produced how, when, where and with what resources. Although it has been emphasised to play an important role in determining shipbuilding time and cost, scientific research on build strategy is limited. In this study, we focus on three interrelated build strategic factors of particular importance in European shipbuilding: hull production offshoring, pre-erection outfitting and the overlap between engineering and production. The study investigates how each of these three factors relates to physical ship production time and to total ship delivery time from contract signing to delivery. We use multiple linear regression on data about European shipyards and the ships they have built, which were obtained from a questionnaire and ship databases. The sample consists of 76 specialised ships, predominantly offshore support vessels, fishing vessels, ferries and other non-cargo carrying vessels, built at 24 European yards. The results provide evidence that yards practicing hull production offshoring have shorter ship production and delivery times than yards building the hulls at their own premises, even though the practice of offshoring itself is likely to have an adverse effect on shipbuilding time. The study also found a significant relationship between the level of pre-erection outfitting and physical production time. On the other hand, overlapping engineering and production only seems to have a limited impact on the production and the delivery time. Several of our results challenge established thinking and provide new insights into the factors affecting production and delivery time in European shipbuilding.en_US
dc.language.isoengen_US
dc.publisherSAGEen_US
dc.rightsNavngivelse 4.0 Internasjonal*
dc.rights.urihttp://creativecommons.org/licenses/by/4.0/deed.no*
dc.titleSome relationships between build strategy and shipbuilding time in European shipbuildingen_US
dc.title.alternativeSome relationships between build strategy and shipbuilding time in European shipbuildingen_US
dc.typePeer revieweden_US
dc.typeJournal articleen_US
dc.description.versionacceptedVersionen_US
dc.source.journalJournal of Engineering for the Maritime Environment (Part M)en_US
dc.identifier.doi10.1177/14750902221141749
dc.identifier.cristin2161185
cristin.ispublishedtrue
cristin.fulltextpostprint
cristin.qualitycode1


Tilhørende fil(er)

Thumbnail

Denne innførselen finnes i følgende samling(er)

Vis enkel innførsel

Navngivelse 4.0 Internasjonal
Med mindre annet er angitt, så er denne innførselen lisensiert som Navngivelse 4.0 Internasjonal