Vis enkel innførsel

dc.contributor.authorMadlener, Reinhard
dc.contributor.authorGlensk, Barbara
dc.contributor.authorGläsel, Lukas
dc.date.accessioned2020-02-13T11:54:05Z
dc.date.available2020-02-13T11:54:05Z
dc.date.created2020-02-04T10:19:07Z
dc.date.issued2019
dc.identifier.issn1996-1073
dc.identifier.urihttp://hdl.handle.net/11250/2641525
dc.description.abstractIn this paper, we investigate capacity expansion, the technological development of wind turbine generators, and the merits of onshore wind repowering in Germany. We analyze the regulatory framework that is presently in place and its impact on the profitability of the onshore wind parks commissioned under previous regulatory frameworks. The optimal timing of repowering under today’s market premium model is scrutinized. Repowering in a market without subsidies for onshore wind energy is also evaluated. In the two cases (regimes) investigated, the electricity price is modeled stochastically as a geometric Brownian motion process. More specifically, using a real options modeling framework for investments under a free market regime, we analyze how the regime change affects the optimal timing of repowering. Further, we check the results for their robustness via a sensitivity analysis for both analyzed regimes. We find that repowering well before the plant’s expected end of life (‘early repowering’) can be economically preferable under the German Renewable Energy Sources Act 2017 remuneration scheme and that, due to the electricity spot market price development, repowering under the market premium regime is more profitable than it is under the free market regime. The economic viability is strongly influenced by the duration of the initial tariff granted to the old installation, the expected digression factor of the future reference tariff, and the increase in electricity generation achieved through repowering.nb_NO
dc.language.isoengnb_NO
dc.publisherMDPInb_NO
dc.rightsNavngivelse 4.0 Internasjonal*
dc.rights.urihttp://creativecommons.org/licenses/by/4.0/deed.no*
dc.titleOptimal timing of onshore wind repowering in Germany under policy regime changes: A real options analysisnb_NO
dc.typeJournal articlenb_NO
dc.typePeer reviewednb_NO
dc.description.versionpublishedVersionnb_NO
dc.source.volume12nb_NO
dc.source.journalEnergiesnb_NO
dc.source.issue24nb_NO
dc.identifier.doi10.3390/en12244703
dc.identifier.cristin1790581
dc.description.localcode© 2019 by the authors. Licensee MDPI, Basel, Switzerland. This article is an open access article distributed under the terms and conditions of the Creative Commons Attribution (CC BY) license (http://creativecommons.org/licenses/by/4.0/).nb_NO
cristin.unitcode194,60,25,0
cristin.unitnameInstitutt for industriell økonomi og teknologiledelse
cristin.ispublishedtrue
cristin.fulltextoriginal
cristin.qualitycode1


Tilhørende fil(er)

Thumbnail

Denne innførselen finnes i følgende samling(er)

Vis enkel innførsel

Navngivelse 4.0 Internasjonal
Med mindre annet er angitt, så er denne innførselen lisensiert som Navngivelse 4.0 Internasjonal