Vis enkel innførsel

dc.contributor.advisorKleppe, Jon
dc.contributor.authorNorheim, Sindre
dc.date.accessioned2019-09-11T09:02:38Z
dc.date.created2016-06-10
dc.date.issued2016
dc.identifierntnudaim:15628
dc.identifier.urihttp://hdl.handle.net/11250/2615199
dc.description.abstractBy evaluating the available inflow control equipment, results show that completing the well with a constant inflow cross-section area for every screen section along the horizontal well gives great results regarding increased recovery and economic gain. Depending on how long the well is to be in production, the net present value (NPV) for the different cases varies, but the NPV calculations presented in this thesis give the basis needed to make a decision to which NICD design is the most appropriate for West Cable.en
dc.languageeng
dc.publisherNTNU
dc.subjectPetroleumsfag, Reservoarteknologi og petrofysikken
dc.titleOptimize Nozzle Based Inflow Control Devices at West Cableen
dc.typeMaster thesisen
dc.source.pagenumber97
dc.contributor.departmentNorges teknisk-naturvitenskapelige universitet, Fakultet for ingeniørvitenskap,Institutt for geovitenskap og petroleumnb_NO
dc.date.embargoenddate10000-01-01


Tilhørende fil(er)

Thumbnail
Thumbnail

Denne innførselen finnes i følgende samling(er)

Vis enkel innførsel