Vis enkel innførsel

dc.contributor.authorNeupane, Bibek
dc.contributor.authorPanthi, Krishna Kanta
dc.date.accessioned2017-10-03T12:40:48Z
dc.date.available2017-10-03T12:40:48Z
dc.date.created2012-04-10T14:51:36Z
dc.date.issued2012
dc.identifier.citationHydro Nepal: Journal of Water, Energy and Environment. 2012, (10), 73-80.nb_NO
dc.identifier.issn1998-5452
dc.identifier.urihttp://hdl.handle.net/11250/2458103
dc.description.abstractOptimization of rock support is a key for the successful use of underground space for hydropower development in the Himalaya. Therefore, finding innovative, optimum and economic solution will be the only way to guarantee on such optimization. A main issue is to find out the extent of hydraulic fracturing and access the water leakage possibility during the operation of such tunnels. The leaked water not only causes economic loss but also may severely affect the stability of tunnel, valley side slopes and the environment. The use of fully concrete/steel lined pressure tunnels against hydraulic fracturing in the rock mass is of costly solution. Hence, it is advantageous to explore possibilities of minimizing the length of the concrete or steel lining in high pressure tunnels and shafts. A proper assessment of hydraulic fracturing of the rock mass plays an important role in this endeavor. This paper evaluates whether or not hydraulic fracturing (splitting) will occur at the 4750m long shotcrete-lined high pressure headrace tunnel of 456 MW Upper Tamakoshi Hydroelectric Project (UTKHEP). The Upper Tamakoshi HEP is a high head project (gross head 822m) and the proposed shotcrete lined high pressure headrace tunnel will experience maximum hydrostatic pressure head of 40 bar (400m water column) at normal plant operation. To check the possibility of hydraulic fracturing, both deterministic and two dimensional numerical modeling techniques have been used. In addition, the paper also highlights the importance and challenges to be faced while estimating representative input variables needed for both deterministic and numerical modellingnb_NO
dc.language.isoengnb_NO
dc.publisherNepal Journals OnLinenb_NO
dc.titleEvaluation on the Potential Use of Shotcrete Lined High Pressure Tunnel at Upper Tamakoshi Hydroelectric Projectnb_NO
dc.typeJournal articlenb_NO
dc.typePeer reviewednb_NO
dc.description.versionpublishedVersionnb_NO
dc.source.pagenumber73-80nb_NO
dc.source.journalHydro Nepal: Journal of Water, Energy and Environmentnb_NO
dc.source.issue10nb_NO
dc.identifier.doi10.3126/hn.v10i0.7118
dc.identifier.cristin919394
dc.description.localcodeCopyright (c) 2012 Hydro Nepal: Journal of Water, Energy and Environmentnb_NO
cristin.unitcode194,64,10,0
cristin.unitnameInstitutt for geologi og bergteknikk
cristin.ispublishedtrue
cristin.fulltextoriginal
cristin.qualitycode1


Tilhørende fil(er)

Thumbnail

Denne innførselen finnes i følgende samling(er)

Vis enkel innførsel