dc.description.abstract | The installation of monopile is a very important process in offshore wind turbine construction.
Duringthemonopilebeingdrivendownbyhydraulichammer,hugeenergytransfersfromham
mer to pile, which may cause monopile inclination. In order to keep the monopile steady in
horizontal direction, a gripper device is applied between the monopile and installation vessel.
Thegrippercontactswithmonopilebyfourhydrauliccylinders. Inthemosttime,thehydraulic
cylinder contacts with the smooth surface on the monopile, and it only bears axial load. While,
the monopile is welded piece by piece, its surface is not perfectly smooth due to welds. The
welds collide with the hydraulic cylinder and induce a vertical force on the hydraulic cylinder,
whichmaydamagethehydrauliccylinder.
This thesis analyzes the installation of monopile by HLV and hydraulic hammer. It presents
modelling and calculation for the collision problem between welds and hydraulic cylinder. A
finiteelementmodelformonopile,weldsandgripperisbuiltinAbaqusCAE.Theexternalloads
including hammer load, soil resistance and cylinder force is obtained from hand calculation or
previousthesisandthenappliedintothefiniteelementmodel. Theeffectsofchangingdifferent
parameters (such as welds thickness, hammer energy, initial penetration depth etc.) is carried
outforanalyzingthemethodforreducingthegripperstressduringcolliding. | |