Vis enkel innførsel

dc.contributor.advisorKleppe, Jonnb_NO
dc.contributor.authorEssien, Imoh Samsonnb_NO
dc.date.accessioned2014-12-19T12:16:31Z
dc.date.available2014-12-19T12:16:31Z
dc.date.created2012-11-10nb_NO
dc.date.issued2012nb_NO
dc.identifier566903nb_NO
dc.identifierntnudaim:7632nb_NO
dc.identifier.urihttp://hdl.handle.net/11250/239840
dc.description.abstractI performed manual History Matching on the E-segment of the Norne field based on available production & pressure data. I used the obtained final match for future prediction. I performed Production Optimization by experimenting with increased and decreased water injection rates.nb_NO
dc.languageengnb_NO
dc.publisherInstitutt for petroleumsteknologi og anvendt geofysikknb_NO
dc.subjectntnudaim:7632no_NO
dc.subjectMSG1 Petroleum Engineeringno_NO
dc.subjectReservoir Engineeringno_NO
dc.titleHistory Matching, Forecasting & Production Optimization on Norne E-Segmentnb_NO
dc.typeMaster thesisnb_NO
dc.source.pagenumber69nb_NO
dc.contributor.departmentNorges teknisk-naturvitenskapelige universitet, Fakultet for ingeniørvitenskap og teknologi, Institutt for petroleumsteknologi og anvendt geofysikknb_NO


Tilhørende fil(er)

Thumbnail
Thumbnail

Denne innførselen finnes i følgende samling(er)

Vis enkel innførsel