Vis enkel innførsel

dc.contributor.authorMrzyglod, Rafalnb_NO
dc.date.accessioned2014-12-19T12:14:59Z
dc.date.available2014-12-19T12:14:59Z
dc.date.created2011-06-10nb_NO
dc.date.issued2010nb_NO
dc.identifier422071nb_NO
dc.identifier.urihttp://hdl.handle.net/11250/239450
dc.description.abstractGullfaks South is the main satellite field in the main Gullfaks Field. So far the satellite field has been developed from Gullfaks platform C. Today, Gullfaks South field is in depletion phase and primary recovery slowly is finish. The objective of this thesis is to exam the economical possibility to develop Gullfaks South. The geological formation is heterogeneous. To increase the recovery it is necessary to drill new wells. Based on the existing Eclipse reservoir simulation model, proposed new production, injection well locations to optimize the forecast production profile. Based on the simulated recovery in combination with estimated cost of new wells, I made a calculation of the net present value and other economic indicators for further development of Gullfaks South. I evaluated the most sensitivity parameter related to this development.nb_NO
dc.languageengnb_NO
dc.publisherNorges teknisk-naturvitenskapelige universitet, Fakultet for ingeniørvitenskap og teknologi, Institutt for petroleumsteknologi og anvendt geofysikknb_NO
dc.titleFeasibility study of developing Gullfaks South fieldnb_NO
dc.title.alternativeMulighetsstudie for utvikling av Gullfaks Sør feltetnb_NO
dc.typeMaster thesisnb_NO
dc.contributor.departmentNorges teknisk-naturvitenskapelige universitet, Fakultet for ingeniørvitenskap og teknologi, Institutt for petroleumsteknologi og anvendt geofysikknb_NO


Tilhørende fil(er)

Thumbnail

Denne innførselen finnes i følgende samling(er)

Vis enkel innførsel