• norsk
    • English
  • norsk 
    • norsk
    • English
  • Logg inn
Vis innførsel 
  •   Hjem
  • Fakultet for ingeniørvitenskap (IV)
  • Institutt for energi og prosessteknikk
  • Vis innførsel
  •   Hjem
  • Fakultet for ingeniørvitenskap (IV)
  • Institutt for energi og prosessteknikk
  • Vis innførsel
JavaScript is disabled for your browser. Some features of this site may not work without it.

A Building Information Model (BIM) Based Lifecycle Assessment of a University Hospital Building Built to Passive House Standards

Grann, Blane
Master thesis
Thumbnail
Åpne
566319_FULLTEXT01.pdf (4.505Mb)
566319_COVER01.pdf (184.3Kb)
Permanent lenke
http://hdl.handle.net/11250/234826
Utgivelsesdato
2012
Metadata
Vis full innførsel
Samlinger
  • Institutt for energi og prosessteknikk [2622]
Sammendrag
This thesis undertook a whole building lifecycle assessment of a university hospital building in Trondheim, Norway designed to passive house standards. The delivered energy for electricity and heating was estimated to be 122 kWh/m2. Impacts outside the energy used during the operational phase of the building were significant including 30% of greenhouse gas emissions, 41% of terrestrial acidification and 43% of particulate matter formation. Normalized to the number of staff, the building emits roughly 0.75 tonnes of CO2 equivalents per year over the 50 year life of the building.
Utgiver
Institutt for energi- og prosessteknikk

Kontakt oss | Gi tilbakemelding

Personvernerklæring
DSpace software copyright © 2002-2019  DuraSpace

Levert av  Unit
 

 

Bla i

Hele arkivetDelarkiv og samlingerUtgivelsesdatoForfattereTitlerEmneordDokumenttyperTidsskrifterDenne samlingenUtgivelsesdatoForfattereTitlerEmneordDokumenttyperTidsskrifter

Min side

Logg inn

Statistikk

Besøksstatistikk

Kontakt oss | Gi tilbakemelding

Personvernerklæring
DSpace software copyright © 2002-2019  DuraSpace

Levert av  Unit