Blar i Institutt for konstruksjonsteknikk på forfatter "Pawlik, Ewa"
-
Design of a Post-tensioned Concrete Bridge
Pawlik, Ewa (Master thesis, 2016)This Master s Thesis covers topic of designing a post-tensioned concrete bridge. The total length of the bridge is 73 m and it is divided into 3 spans: two spans, which length of each is 22,5 m and one span, which length ...