Vis enkel innførsel

dc.contributor.authorRahmani, Mina
dc.contributor.authorRomsdal, Anita
dc.contributor.authorSyversen, Øyvind
dc.contributor.authorSgarbossa, Fabio
dc.contributor.authorStrandhagen, Jan Ola
dc.date.accessioned2023-11-20T09:38:25Z
dc.date.available2023-11-20T09:38:25Z
dc.date.created2023-10-18T11:15:40Z
dc.date.issued2023
dc.identifier.isbn978-3-031-43670-3
dc.identifier.urihttps://hdl.handle.net/11250/3103502
dc.description.abstractIndustry 4.0 is providing unprecedented opportunities for the capture and use of data into production planning and control (PPC). The accuracy of such data for PPC has been found to have a direct positive effect on operational performance. This study builds on a dynamic approach where production feedback data is used to improve the accuracy of master data used in tactical planning. The study applies a model-based approach using data from a real case. Two illustrative sensitivity analyses indicate that even small deviations in the accuracy of master data have an impact on the production schedule in terms of job sequence and makespan. The paper's main theoretical contribution is the development of six propositions on this relationship, where in short, the sequence appears to be sensitive to the accuracy of both changeover time and processing time. The paper illustrates how sensitivity analysis can be used in investment decisions about which production feedback data to capture and use for PPC purposes. Further research should test the propositions in more real cases and other production environments and carry out sensitivity analyses with more types of master data, variables, and combinations.en_US
dc.language.isoengen_US
dc.publisherSpringeren_US
dc.relation.ispartofAdvances in Production Management Systems. Production Management Systems for Responsible Manufacturing, Service, and Logistics Futures IFIP WG 5.7 International Conference, APMS 2023, Trondheim, Norway, September 17–21, 2023, Proceedings, Part III
dc.titleProduction scheduling using production feedback data; an illustrative case studyen_US
dc.title.alternativeProduction scheduling using production feedback data; an illustrative case studyen_US
dc.typeChapteren_US
dc.description.versionacceptedVersionen_US
dc.source.pagenumber844-858en_US
dc.identifier.doi10.1007/978-3-031-43670-3_59
dc.identifier.cristin2185838
dc.relation.projectNorges forskningsråd: 296686en_US
cristin.ispublishedtrue
cristin.fulltextpostprint
cristin.qualitycode1


Tilhørende fil(er)

Thumbnail

Denne innførselen finnes i følgende samling(er)

Vis enkel innførsel