Vis enkel innførsel

dc.contributor.authorFragapane, Giuseppe
dc.contributor.authorBertnum, Aili Biriita
dc.contributor.authorHvolby, Hans-Henrik
dc.contributor.authorStrandhagen, Jan Ola
dc.date.accessioned2019-11-21T13:20:58Z
dc.date.available2019-11-21T13:20:58Z
dc.date.created2019-09-17T11:08:22Z
dc.date.issued2019
dc.identifier.isbn978-3-030-29996-5
dc.identifier.urihttp://hdl.handle.net/11250/2629830
dc.description.abstractIn order to match financial sustainability with the delivery of high-quality healthcare hospitals need to seek efficient ways of managing inventories with a large variety of medical supplies. To find a balance in the trade-off between cost and service levels that ensures on time and high-quality patient treatment is a challenge. It is especially crucial in the hospital setting, where the consequence of a stock-out can be much more severe than lost revenue. The process of ensuring that the required supplies are available at the right time is a particularly important supporting role within hospital logistics. The scope of this study is inventory control at the point-of-use inventories in hospitals. It concerns the short-term planning and control area, which focus on coping with actual demand and making necessary changes in order to match efficiently to plans. This study aims to model the inventory control process and discuss how technology can support high availability of medical supplies in hospitals.nb_NO
dc.language.isoengnb_NO
dc.publisherSpringer Verlagnb_NO
dc.relation.ispartofAdvances in production management systems : towards smart production management systems : IFIP WG 5.7 International Conference, APMS 2019, Austin, TX, USA, September 1–5, 2019, Proceedings, Part II
dc.titleMedical Supplies to the Point-Of-Use in Hospitalsnb_NO
dc.typeChapternb_NO
dc.description.versionacceptedVersionnb_NO
dc.source.pagenumber248-255nb_NO
dc.identifier.doi10.1007/978-3-030-29996-5_29
dc.identifier.cristin1725521
dc.description.localcodeThis is a post-peer-review, pre-copyedit version of an article. Locked until 24.8.2020 due to copyright restrictions. The final authenticated version is available online at: https://doi.org/10.1007/978-3-030-29996-5_29nb_NO
cristin.unitcode194,64,92,0
cristin.unitnameInstitutt for maskinteknikk og produksjon
cristin.ispublishedtrue
cristin.qualitycode1


Tilhørende fil(er)

Thumbnail

Denne innførselen finnes i følgende samling(er)

Vis enkel innførsel