Vis enkel innførsel

dc.contributor.authorHalvor Schrøder, Hansen
dc.contributor.authorNawaz, Muhammad Umer
dc.contributor.authorOlsson, Nils
dc.date.accessioned2017-10-04T12:51:25Z
dc.date.available2017-10-04T12:51:25Z
dc.date.created2017-10-02T10:31:54Z
dc.date.issued2017
dc.identifier.citationJournal of Rail Transport Planning & Management. 2017, 7 (1-2), 62-76.nb_NO
dc.identifier.issn2210-9706
dc.identifier.urihttp://hdl.handle.net/11250/2458431
dc.description.abstractTwo approaches to estimate the running resistance from operational data have been studied: A direct approach based on a measured/estimated acceleration to obtain a resistance time-series, and a velocity-fitting approach based on fitting a predicted to a measured velocity time-series. Two data sets have been considered: The first consists of a velocity time-series, extracted from the train event recorder. The second is logged from the vehicle control unit and includes a time-series of energy consumption and velocity. Velocity-fitting has been shown to be more robust with respect to the data resolution and is the recommended approach. The inclusion of energy consumption (or traction) data is recommended, resulting in more precise estimates. The approach is considered feasible in terms of data storage and transfer requirements, allowing a routinely collection of data from trains in operation. The additional tunnel resistance has been evaluated for a set of 10 tunnels in Norway, giving resistance coefficients ranging from 2.4 to 16.0 kg/m for tunnels with an aerodynamic cross section of 87 to 27 m2 respectively. The comparison to a set of predictions showed that there is a large spread in the predicted additional tunnel resistance. This demonstrates that the choice of prediction method and corresponding coefficients must be taken carefully.nb_NO
dc.language.isoengnb_NO
dc.publisherElseviernb_NO
dc.titleUsing operational data to estimate the running resistance of trains. Estimation of the resistance in a set of Norwegian tunnelsnb_NO
dc.typeJournal articlenb_NO
dc.description.versionsubmittedVersionnb_NO
dc.source.pagenumber62-76nb_NO
dc.source.volume7nb_NO
dc.source.journalJournal of Rail Transport Planning & Managementnb_NO
dc.source.issue1-2nb_NO
dc.identifier.doihttps://doi.org/10.1016/j.jrtpm.2017.01.002
dc.identifier.cristin1501279
dc.description.localcode© 2016. This is the authors submitted manuscript of the article.nb_NO
cristin.unitcode194,64,92,0
cristin.unitnameInstitutt for maskinteknikk og produksjon
cristin.ispublishedtrue
cristin.fulltextpreprint
cristin.qualitycode1


Tilhørende fil(er)

Thumbnail

Denne innførselen finnes i følgende samling(er)

Vis enkel innførsel