Blar i NTNU Open på forfatter "Mejlænder-Larsen, Øystein"
-
A three-step process for reporting progress in detail engineering using BIM, based on experiences from oil and gas projects
Mejlænder-Larsen, Øystein (Journal article; Peer reviewed, 2019)Purpose Traditionally, progress in detail engineering in construction projects is reported based on estimates and manual input from the disciplines in the engineering team. Reporting progress on activities in an engineering ... -
Generalising via the Case Studies and Adapting the Oil and Gas Industry's Project Execution Concepts to the Construction Industry
Mejlænder-Larsen, Øystein (Journal article; Peer reviewed, 2015)The aim of this paper is to explore whether it is possible to generalise findings on project execution in the oil and gas industryrelated to the use of project execution models and a 3D ... -
Improving collaboration between engineering and construction in detail engineering using a project execution model and BIM
Mejlænder-Larsen, Øystein (Journal article; Peer reviewed, 2018)The construction industry is under pressure to reduce project delivery time and costs despite increased project complexity. A challenge is that engineering and construction are not well integrated. Usually engineering takes ... -
Improving Transition from Engineering to Construction Using a Project Execution Model and BIM
Mejlænder-Larsen, Øystein (Journal article; Peer reviewed, 2016) -
Stakeholder perspectives and information exchange in AEC projects
Meistad, Torill; Støre-Valen, Marit; Knotten, Vegard; Hosseini, Ali; Klakegg, Ole Jonny; Mejlænder-Larsen, Øystein; Hjelseth, Eilif; Svalestuen, Fredrik; Lædre, Ola; Hansen, Geir Karsten; Lohne, Jardar (Chapter, 2017) -
Use of project execution models and BIM in oil and gas projects: searching for relevant improvements for construction
Mejlænder-Larsen, Øystein (Doctoral theses at NTNU;2019:71, Doctoral thesis, 2019)The oil and gas industry is characterized by large and complex projects and has invested heavily in the development of new technology. Project execution models (PEM) have been introduced as a structured way of executing ... -
Using BIM To Follow Up Milestones In A Project Plan During The Design Phase
Mejlænder-Larsen, Øystein (Journal article; Peer reviewed, 2015)Traditionally, progress in construction projects is done by manually reporting status on activities in a project plan, very often based on subjective evaluation. This increases the possibility to report different status ...