• norsk
    • English
  • English 
    • norsk
    • English
  • Login
View Item 
  •   Home
  • Øvrige samlinger
  • Publikasjoner fra CRIStin - NTNU
  • View Item
  •   Home
  • Øvrige samlinger
  • Publikasjoner fra CRIStin - NTNU
  • View Item
JavaScript is disabled for your browser. Some features of this site may not work without it.

The Use of Mathematical Programming to Determine Optimal Production and Drilling Schedule in an Offshore Oil Field, A Case Study From the Barents Sea

Lei, Guowen; Stanko Wolf, Milan Edvard; Silva, Thiago Lima; Widerøe, Tom; Skogvang, Arnljot
Chapter
Published version
Thumbnail
View/Open
Lei (1.914Mb)
URI
https://hdl.handle.net/11250/2984481
Date
2021
Metadata
Show full item record
Collections
  • Institutt for geovitenskap og petroleum [2175]
  • Publikasjoner fra CRIStin - NTNU [26648]
Original version
10.1115/OMAE2021-62697
Abstract
A field with two neighboring reservoirs was discovered in the Barents Sea in 2013 and 2014. After a successful extended well test of an appraisal well in 2018 and initial field planning tasks, a preliminary drilling and production schedule was proposed based on cross-domain collaboration and group work involving several disciplines. In this paper, mathematical programming is employed to model and optimize the economic value of the project in order to determine the best drilling and production schedule for the field. The optimization includes some of the technical constraints considered by the field development team while also considering uncertainties such as reservoir size, productivity of well, and cost. These have been systematically evaluated by using simulation-based optimization (sampling). The results were that the use of mathematical programming allows the field planner to evaluate several scenarios within a reasonable time frame, thereby enabling rapid changes in the decisions to respond to new information and risk considerations in a dynamic environment. This paper illustrates the benefits of utilizing mathematical programming in early field planning to optimize the drilling and production schedule.
Publisher
ASME
Copyright
© ASME

Contact Us | Send Feedback

Privacy policy
DSpace software copyright © 2002-2019  DuraSpace

Service from  Unit
 

 

Browse

ArchiveCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsDocument TypesJournalsThis CollectionBy Issue DateAuthorsTitlesSubjectsDocument TypesJournals

My Account

Login

Statistics

View Usage Statistics

Contact Us | Send Feedback

Privacy policy
DSpace software copyright © 2002-2019  DuraSpace

Service from  Unit