dc.description.abstractCost growth and cost overrun of projects is a well-researched topic, but still a recurring problem. Some of the problems may be attributed to the difficulties of setting a realistic cost estimate in the early phase of the project. This paper aims to give insight o the challenge of setting realistic cost targets. We particularly focus on large and complex infrastructure projects in the context on the Norwegian construction industry. Four large infrastructure projects have been examined, all used a variation of target cost and was more or less successful in their implementation of this approach. Through interviews and document study we identified that when setting cost targets for projects, both allowable cost and target cost should be considered. Allowable cost should be defined by the project owner, implying that the allowable cost should be set before the start of design. Furthermore, the target cost should either be set by the project owner or in dialogue with the design and contractor team. The study concludes that it is important that the target cost is set 12 – 20 % below allowable cost so that it is possible both to drive innovations through the design process and to be able to handle risks during construction.en_US
dc.language.isoengen_US
dc.publisherElsevieren_US
dc.rightsAttribution-NonCommercial-NoDerivatives 4.0 Internasjonal*
dc.rights.urihttp://creativecommons.org/licenses/by-nc-nd/4.0/deed.no*
dc.titleDevelopment of target cost – By the owner or together with Contractors - Target Value Designen_US
dc.typePeer revieweden_US
dc.typeJournal articleen_US
dc.description.versionpublishedVersionen_US
dc.source.pagenumber1171-1178en_US
dc.source.volume181en_US
dc.source.journalProcedia Computer Scienceen_US
dc.identifier.doi10.1016/j.procs.2021.01.314
dc.identifier.cristin1892746
dc.relation.projectSørlandet kompetansefond: 2016/33en_US
dc.relation.projectNorges forskningsråd: 273700en_US
cristin.ispublishedtrue
cristin.fulltextoriginal
cristin.fulltextoriginal
cristin.qualitycode1


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record

Attribution-NonCommercial-NoDerivatives 4.0 Internasjonal
Except where otherwise noted, this item's license is described as Attribution-NonCommercial-NoDerivatives 4.0 Internasjonal