Vis enkel innførsel

dc.contributor.authorBakker, Steffen J.
dc.contributor.authorKleiven, Andreas
dc.contributor.authorFleten, Stein-Erik
dc.contributor.authorTomasgard, Asgeir
dc.date.accessioned2021-10-28T06:35:36Z
dc.date.available2021-10-28T06:35:36Z
dc.date.created2021-07-28T19:52:13Z
dc.date.issued2021
dc.identifier.citationComputers & Operations Research. 2021, 136 .en_US
dc.identifier.issn0305-0548
dc.identifier.urihttps://hdl.handle.net/11250/2826105
dc.description.abstractOil and gas companies are facing low output prices and are forced to focus on the development of mature fields. Relevant investment decisions for operators include lifetime-enhancing activities, such as drilling new wells or permanent shutdown. We study the problem of optimal timing of investments in mature oil and gas fields in the presence of price uncertainty, which is an example of a complex real options problem consisting of a portfolio of interdependent options. We formulate a multistage stochastic integer programming model that incorporates a detailed representation of the uncertain oil price, and demonstrate how such a complex real options problem can be efficiently solved using the Stochastic Dual Dynamic Integer Programming algorithm. The paper presents a numerical example based on realistic data and discusses our computational results. We find that only a small number of Markov states are required to represent the uncertain price process, while obtaining convergence of the lower and upper bounds of the objective function. The value of stochastic solution of 11% is considerable in this example. It is concluded that the shutdown decision tends to be postponed as a result of high decommissioning costs, high discount rates, high price uncertainty and low operational expenditures, while it generally is accelerated if the decommissioning costs increase over time.en_US
dc.language.isoengen_US
dc.publisherElsevieren_US
dc.rightsAttribution-NonCommercial-NoDerivatives 4.0 Internasjonal*
dc.rights.urihttp://creativecommons.org/licenses/by-nc-nd/4.0/deed.no*
dc.titleMature offshore oil field development: Solving a real options problem using stochastic dual dynamic integer programmingen_US
dc.typePeer revieweden_US
dc.typeJournal articleen_US
dc.description.versionpublishedVersionen_US
dc.source.pagenumber11en_US
dc.source.volume136en_US
dc.source.journalComputers & Operations Researchen_US
dc.identifier.doihttps://doi.org/10.1016/j.cor.2021.105480
dc.identifier.cristin1922918
dc.relation.projectNorges forskningsråd: 247589en_US
cristin.ispublishedtrue
cristin.fulltextpreprint
cristin.fulltextoriginal
cristin.qualitycode2


Tilhørende fil(er)

Thumbnail

Denne innførselen finnes i følgende samling(er)

Vis enkel innførsel

Attribution-NonCommercial-NoDerivatives 4.0 Internasjonal
Med mindre annet er angitt, så er denne innførselen lisensiert som Attribution-NonCommercial-NoDerivatives 4.0 Internasjonal