Vis enkel innførsel

dc.contributor.advisorRwechungura, Richard Wilfred
dc.contributor.authorMaswi, Anthony Richard
dc.date.accessioned2019-09-11T09:02:54Z
dc.date.created2016-09-15
dc.date.issued2016
dc.identifierntnudaim:15813
dc.identifier.urihttp://hdl.handle.net/11250/2615230
dc.description.abstractEvaluation of field development in the reservoir section by reviewing well placement and scheduling aiming at increasing productivity in the field. The case study was Songo Songo gas field whereby sensitivity analysis based on economic and total production. Evaluation for well placement and scheduling was done using CMG-IMEX black oil reservoir simulator and Excel model.en
dc.languageeng
dc.publisherNTNU
dc.subjectPetroleum Engineering, Reservoir Engineering and Petrophysicsen
dc.titleEvaluation of Songo Songo Gas Field Development Approachen
dc.typeMaster thesisen
dc.source.pagenumber102
dc.contributor.departmentNorges teknisk-naturvitenskapelige universitet, Fakultet for ingeniørvitenskap,Institutt for geovitenskap og petroleumnb_NO
dc.date.embargoenddate10000-01-01


Tilhørende fil(er)

Thumbnail
Thumbnail

Denne innførselen finnes i følgende samling(er)

Vis enkel innførsel