Blar i HydroCen - Rapportserie på forfatter "Helseth, Arild"
-
Environmental Constraints in Seasonal Hydropower Scheduling - Survey and Feasibility
Helseth, Arild (HydroCen Report;12, Research report, 2019)The work documented in this report has been carried out in project WP3.4 in the HydroCen research center. We have surveyed the need for improved modelling of environmental and technical constraints related to operational ... -
Environmental measures impact on hydro power system (FlexMet)
Helseth, Arild (HydroCen brief;Nr. 11, Report, 2022) -
Pre‐project: Fundamental modelling of a 100 % renewable electricity system
Helseth, Arild; Mo, Birger (HydroCen brief;Nr. 15, Report, 2022)The memo summarizes the literature review that was carried out as part of the development of the KSP application "RES – Modelling a 100% Renewable Electricity System". -
Ramping Constraints in Hydropower Scheduling: With application in the SDDP-based ProdRisk model
Helseth, Arild; Rex, Stefan (HydroCen Rapport;39, Research report, 2023)Ramping constraints on water flows in hydropower systems may, e.g., ensure the preservation of ecological conditions, safely operate river systems, and prevent unfavorable ice formation. In this work we study how ramping ... -
Strengthened Benders cuts for treatment of state‐dependent discharge in ProdRisk
Helseth, Arild; Mathisen, Siri (HydroCen brief;Nr. 10, Report, 2021)