Vis enkel innførsel

dc.contributor.authorPanthi, Krishna Kanta
dc.contributor.authorBasnet, Chhatra Bahadur
dc.date.accessioned2018-02-01T11:36:51Z
dc.date.available2018-02-01T11:36:51Z
dc.date.created2017-02-24T13:08:54Z
dc.date.issued2017
dc.identifier.citationInternational journal on hydropower and dams. 2017, 24 (Issue 1), 60-67.nb_NO
dc.identifier.issn1352-2523
dc.identifier.urihttp://hdl.handle.net/11250/2481181
dc.description.abstractOne way to reduce the cost of construction of hydroelectric projects with underground waterway systems is to allow the rock mass to act as natural concrete and to adopt unlined/shotcrete-lined pressure tunnels to the extent that the rock mass permits. This article reviews engineering geological design aspects and design changes adopted for the headrace system of Upper Tamakoshi hydro project in Nepal, as more studies were done to increase knowledge of the geological characteristics of the rock mass and in situ stresses in the project area.nb_NO
dc.language.isoengnb_NO
dc.publisherAqua-media Internationalnb_NO
dc.titleDesign review of the headrace system for the Upper Tamakoshi project, Nepalnb_NO
dc.typeJournal articlenb_NO
dc.typePeer reviewednb_NO
dc.description.versionpublishedVersionnb_NO
dc.source.pagenumber60-67nb_NO
dc.source.volume24nb_NO
dc.source.journalInternational journal on hydropower and damsnb_NO
dc.source.issueIssue 1nb_NO
dc.identifier.cristin1453702
dc.description.localcodeThis article will not be available due to copyright restrictions (c) 2017 by Aqua-media Internationalnb_NO
cristin.unitcode194,64,10,0
cristin.unitnameInstitutt for geologi og bergteknikk
cristin.ispublishedtrue
cristin.fulltextoriginal
cristin.qualitycode1


Tilhørende fil(er)

Thumbnail

Denne innførselen finnes i følgende samling(er)

Vis enkel innførsel