Browsing Institutt for geovitenskap og petroleum by Subject "MSB1 Hydropower Development"
Now showing items 1-4 of 4
-
Head Race Tunnel Melado Hydropower Plant, Chile: Optimization in Excavation and Rock Support
(Master thesis, 2012)The present thesis is to focus on the two head race tunnels within the Melado HPP, Chile. The upstream tunnel is called Castillo 7800 m long and the downstream tunnel is called Vallical 8800 m long.The feasibility study ... -
Stability Analysis for Underground Power House at Tala Hydroelectric Power Project, Bhutan
(Master thesis, 2012)Concerning socio-economic development of Bhutan, Hydropower development plays a vital role. Envisaging a total theoretical potential of 30,000 MW, according to Power System Master Plan, 2002, the government now has taken ... -
STABILITY ASSESSMMENT OF THE UNDERGROUND SETTLING BASIN CAVERNS OF SUPER MADI HYDROELECTRIC PROJECT,NEPAL
(Master thesis, 2012)Super Madi Hydrolectric Project (SMHEP) is located in Kaski District of Nepal. It is a run of river scheme with a installed capacity of 44 MW, net head of 295m and design discharge of 18 m^3⁄s.It has planned to build for ... -
STABILTY ASSESSMENT OF HEADRACE TUNNEL SYSTEM FOR PUNATSANGCHHU II HYDROPOWER PROJECT, BHUTAN
(Master thesis, 2012)Bhutan is a small Buddhist country nested in the cradles of the eastern Himalayas. It has rugged mountainous terrains with altitudes ranging from 500 masl in its southern plains to 4500masl in the snowy capped mountains ...