• Collaborative project delivery methods: a scoping review 

      Engebø, Atle; Lædre, Ola; Young, Brendan; Larssen, Per Fridtjof; Lohne, Jardar; Klakegg, Ole Jonny (Peer reviewed; Journal article, 2020)
      Understanding how to systemise, organise, and finance the design, construction, operation, and maintenance activities are all parameters needed to be optimised simultaneously in a Project Delivery Method. To meet the ...
    • Evaluating fatigue behavior of asphalt binders and mixes containing Date Seed Ash 

      Foroutan Mirhosseini, Seyed Ali; Kavussi, Amir; Jalal Kamali, Mohammad Hossain; Khabiri, Mohammad Mehdi; Hassani, Abolfazl (Journal article; Peer reviewed, 2017)
      Fatigue is one of the most occurring distresses in asphalt pavements. Asphalt binder plays a critical role in fa­tigue behavior of asphalt mixes. Modelling and predicting fatigue behavior of binders will result in more ...
    • WHY CONFLICTS OCCUR IN ROADS AND TUNNELS PROJECTS IN NORWAY 

      Sabri, Omar; Bruland, Amund; Lædre, Ola (Journal article; Peer reviewed, 2018)
      Conflicts within the Norwegian construction industry have reached unacceptable levels. The grievance of these disputes, whether it is the number of conflicts or the expense involved in these conflicts, is under discussion. ...