• Continuous Efficiency Measurements on Hydro Power Plants 

      Wiborg, Erik Jacques (Doctoral theses at NTNU;2016:330, Doctoral thesis, 2016)
      In 2012 the largest Norwegian power production company Statkraft initiated a research and development project initially named BlackBox. The company’s main objective for the project was to develop an experimental condition ...
    • Real Option Analysis of Hydro Turbine Replacements 

      Backer, Helle; Dalvik, Maria Fjelltun; Herabakka, Sølvi (Master thesis, 2022)
      I denne masteroppgaven undersøker vi det optimale tidspunktet for en turbinutskifting i et vannkraftverk med to usikkerhetsfaktorer; strømpris og risiko for svikt. Målet vårt er å utvikle en investeringsmodell for en ...
    • Real Option Analysis of Hydro Turbine Replacements 

      Backer, Helle; Dalvik, Maria Fjelltun; Herabakka, Sølvi (Master thesis, 2022)
      I denne masteroppgaven undersøker vi det optimale tidspunktet for en turbinutskifting i et vannkraftverk med to usikkerhetsfaktorer; strømpris og risiko for svikt. Målet vårt er å utvikle en investeringsmodell for en ...