Browsing NTNU Open by Author "Wang, Yukun"
Now showing items 1-5 of 5
-
Joint optimization of performance-based contracting, condition-based maintenance and spare parts inventory for degrading production systems
Wang, Yukun; Liu, Yiliu; Gao, Weizheng; Li, Xiaopeng (Journal article; Peer reviewed, 2024)As a novel supporting approach, performance-based contracting (PBC) ties the service supplier’s compensation to the performance outcome of the system owned by the customer. It enables the service supplier to implement an ... -
Multi-phase reliability growth test planning for repairable products sold with a two-dimensional warranty
Wang, Yukun; Liu, Yiliu; Li, Xiaopeng; Chen, Junyan (Journal article; Peer reviewed, 2019)For products sold with a two-dimensional warranty policy, the warranty servicing cost can be reduced through reliability growth during development. This paper investigates a multi-phase reliability growth test program for ... -
Optimal reliability growth program for repairable and warranted products
Liu, Yiliu; Wang, Yukun (Chapter, 2019)Considering a two-dimensional and non-renewing free repair warranty (NFRW) policy, this paper proposes a modified reliability growth model to support the decision making of the manufacturer on the choice of a reliability ... -
Preventive maintenance optimization for repairable products considering two-dimensional warranty and customer satisfaction
Wang, Yukun; Liu, Yiliu; Zhang, Aibo (Journal article; Peer reviewed, 2018)Customer satisfaction with a purchased product is closely related to the product performance within the warranty region and even the performance during the remainder of its useful life. Every satisfied customer may boost ... -
Prognostic and health management for safety barriers in infrastructures: opportunities and challenges
Zhang, Aibo; Liu, Yiliu; Barros, Anne; Wang, Yukun (Chapter, 2018)Different types of safety barriers are deployed in many infrastructures to reduce the occurrences of hazards, and protect people, environment and other assets in case the unexpected events have occurred and the capacity ...