Hydro power scheduling in multi-owner river systems
Master thesis
Date
2010Metadata
Show full item recordCollections
- Institutt for elkraftteknikk [2410]
Abstract
1. Initial problem formulation 2. Iterative approach building for one reservoir 3. Testing for two cascaded reservoirs 4. Testing for four cascaded reservoirs 5. Further work